50 kW• Fast24/7Active in MITECO registry

Villamediana de Iregua - C.Anastasio Mateo 8

Calle Anastasio Mateo ,8, Villamediana de Iregua (26142), Rioja, La, Spain
Network OperatorCHARGING TOGETHER SL
Total Capacity4 bays (4 plugs)
GPS Coordinates42.42765, -2.41820
Official IDQSNQLK2OEXRNZXYPJGOV

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Villamediana de Iregua, belonging to the province of Rioja, La (Rioja, La, Spain). The charging equipment and commercial operation belong to the CHARGING TOGETHER SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 250 kW
Current type:Direct Current (DC)
Format:Cable
Voltage:1000 V
Amperage:150 A
2Charging Bay #2
1 connector available
CCS Combo 250 kW
Current type:Direct Current (DC)
Format:Cable
Voltage:1000 V
Amperage:150 A
3Charging Bay #3
1 connector available
CCS Combo 250 kW
Current type:Direct Current (DC)
Format:Cable
Voltage:1000 V
Amperage:150 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)22 kW
Current type:Alternating Current (AC)
Format:Socket
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeQSNQLK2OEXRNZXYPJGOV
Post / EVSE Identifier #1SPJUUQT8179MD250CNQELLBWLQA
Post / EVSE Identifier #2ES*FCT*E229865
Post / EVSE Identifier #3241998
Post / EVSE Identifier #4TO2M2261KYXTLJMWDFOTSAASIAM
Post / EVSE Identifier #5ES*FCT*E229866
Post / EVSE Identifier #6241999
Post / EVSE Identifier #7UQHIJBVKY0ISD6BYAKDXAF42YSE
Post / EVSE Identifier #8ES*FCT*E229867
Post / EVSE Identifier #9242000
Post / EVSE Identifier #1022E2YVNW4DY87CZHMLWUWISWWPM
Post / EVSE Identifier #11ES*FCT*E229868
Post / EVSE Identifier #12242001

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

PAGO CON TARJETA DE CRÉDITO, LECTOR RFID, PAGO CON TARJETA DE DÉBITO, APAGADO/ENCENDIDO REMOTO ADMITIDO

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.427653 | Lon: -2.4182View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)🏨Hotel / Alojamiento
3.8 km away

Hostal Mesón Pepa

Av. Aragón, 9
Operator:WENEA EMOBILITY SERVICES S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 10/09/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.