120 kW• Fast🛒Supermercado Consum24/7Active in MITECO registry

SM Consum - Alboraya Sant Vincent 45

Plaça Sant Vicent, 3, Alboraia/Alboraya (46120), Valencia/València, Spain
Network OperatorERANOVUM E-MOBILITY, S.L.
Total Capacity3 bays (5 plugs)
GPS Coordinates39.50364, -0.35805
Official ID2023002710

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Alboraia/Alboraya, belonging to the province of Valencia/València (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the ERANOVUM E-MOBILITY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
3 connectors available
CCS Combo 2120 kW
Current type:Direct Current (DC)
Format:Cable
Voltage:400 V
Amperage:400 A
CCS Combo 2120 kW
Current type:Direct Current (DC)
Format:Cable
Voltage:400 V
Amperage:400 A
Tipo 2 (Mennekes)22 kW
Current type:Alternating Current (AC)
Format:Socket
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)7 kW
Current type:Alternating Current (AC)
Format:Socket
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)7 kW
Current type:Alternating Current (AC)
Format:Socket
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023002710
Post / EVSE Identifier #1COD20230000012069PR00001472
Post / EVSE Identifier #2ES*ERA*E25112
Post / EVSE Identifier #31
Post / EVSE Identifier #42
Post / EVSE Identifier #53
Post / EVSE Identifier #6COD20230000012070PR00001473
Post / EVSE Identifier #7ES*ERA*E25197
Post / EVSE Identifier #8COD20230000012071PR00001474
Post / EVSE Identifier #9ES*ERA*E25198

Theoretical Charging Times at Maximum Power (120 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~10 min(~0.2 hours)
40 kWh Battery~20 min(~0.3 hours)
60 kWh Battery~30 min(~0.5 hours)
80 kWh Battery~40 min(~0.7 hours)

Opening Hours

24/7

Supported Payment Methods

APAGADO/ENCENDIDO REMOTO ADMITIDO, LECTOR RFID

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.5036411 | Lon: -0.3580497View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
3.5 km away

V-VALENCIA-021

Ricardo Mico,1
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 10/09/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.