69 kW• Fast24/7Active in MITECO registry

La Pobla de Segur - INGETEAM

Carrer De La Font, 14,, Pobla de Segur, La (25500), Lleida, Spain
Network OperatorEtecnic Movilidad Electrica, SRL
Total Capacity5 bays (6 plugs)
GPS Coordinates42.24668, 0.96655
Official ID7DENPNY7WTWMQMCZYH61

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Pobla de Segur, La, belonging to the province of Lleida (Cataluña, Spain). The charging equipment and commercial operation belong to the Etecnic Movilidad Electrica, SRL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CCS Combo 269 kW
Current type:Direct Current (DC)
Format:Cable
Voltage:230 V
Amperage:86 A
CCS Combo 269 kW
Current type:Direct Current (DC)
Format:Cable
Voltage:230 V
Amperage:100 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)22 kW
Current type:Alternating Current (AC)
Format:Socket
Voltage:230 V
Amperage:100 A
3Charging Bay #3
1 connector available
CCS Combo 259 kW
Current type:Direct Current (DC)
Format:Cable
Voltage:230 V
Amperage:86 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)22 kW
Current type:Alternating Current (AC)
Format:Socket
Voltage:230 V
Amperage:86 A
5Charging Bay #5
1 connector available
CCS Combo 259 kW
Current type:Direct Current (DC)
Format:Cable
Voltage:230 V
Amperage:86 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code7DENPNY7WTWMQMCZYH61
Post / EVSE Identifier #1GVEQBPKEF0UT9DKVFVWM0WMEIMJ
Post / EVSE Identifier #2ES*ETE*E60145
Post / EVSE Identifier #3100072047
Post / EVSE Identifier #4100083398
Post / EVSE Identifier #5APQGAFVJGX7AIVZY0UCZMAYDZAX
Post / EVSE Identifier #6ES*ETE*E60146
Post / EVSE Identifier #7100083397
Post / EVSE Identifier #8HVC3IV837QVQQ5B4CMUEDXQNGKS
Post / EVSE Identifier #9ES*ETE*E60142
Post / EVSE Identifier #10100070446
Post / EVSE Identifier #11BQDJ6ENEBENGWZU084FWWGSSB8H
Post / EVSE Identifier #12ES*ETE*E60144
Post / EVSE Identifier #13100070448
Post / EVSE Identifier #14FE4FEKKHYUBPQMXCPNG3O5JALYY
Post / EVSE Identifier #15ES*ETE*E60143
Post / EVSE Identifier #16100070447

Theoretical Charging Times at Maximum Power (69 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~17 min(~0.3 hours)
40 kWh Battery~35 min(~0.6 hours)
60 kWh Battery~52 min(~0.9 hours)
80 kWh Battery~1 h 10 min(~1.2 hours)

Opening Hours

24/7

Supported Payment Methods

APAGADO/ENCENDIDO REMOTO ADMITIDO, LECTOR RFID

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.246677 | Lon: 0.966547View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
9.8 km away

9052-Tremp

Avinguda Dels Pirineus S/N
Operator:BONPREU, S.A.U.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
50 kW(Fast)
11.1 km away

L-LaTorredeCabdella-001

Major,N/A
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
4 points • 5 plugs
Details
22 kW(Semi-fast)
15.1 km away

L-LaTorredeCabdella-002

Únic (La Plana De Mont-Ros),1
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 10/09/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.