22 kW• Semi-fastHorario habitualActive in MITECO registry

E-SE-CoriaDelRio-001

Primero De Mayo,48, Coria del Río (41100), Sevilla, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (2 plugs)
GPS Coordinates37.28936, -6.05261
Official ID2024003468

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Coria del Río, belonging to the province of Sevilla (Andalucía, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)22 kW
Current type:Alternating Current (AC)
Format:Socket
Voltage:800 V
Amperage:40 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)22 kW
Current type:Alternating Current (AC)
Format:Socket
Voltage:800 V
Amperage:40 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024003468
Post / EVSE Identifier #1COD20240000030540PR00008463
Post / EVSE Identifier #2ES*IBD*E233393
Post / EVSE Identifier #3245628
Post / EVSE Identifier #4COD20240000030541PR00008464
Post / EVSE Identifier #5ES*IBD*E233394
Post / EVSE Identifier #6245629

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Martes (09:00 - 21:30) Miercoles (09:00 - 21:30) Lunes (09:00 - 21:30) Domingo (00:00 - 00:00) Jueves (09:00 - 21:30) Sabado (00:00 - 00:00) Viernes (09:00 - 21:30)

Supported Payment Methods

APAGADO/ENCENDIDO REMOTO ADMITIDO, LECTOR RFID

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.289357 | Lon: -6.052611View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)
10.1 km away

WAY Dos hermanas

Av. Ing. José Luis Prats 3
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
49 points • 49 plugs
Details
50 kW(Fast)
10.2 km away

WAY 2 Hermanas - exterior

Av. Ing. José Luis Prats 3
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
6 points • 13 plugs
Details
7.4 kW(Semi-fast)
10.4 km away

SE-Bormujos-002

Francisco Tomas Y Valiente,19
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
12 points • 12 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 10/09/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.