22 kW• Semi-fastHorario habitualActive in MITECO registry

E-NA-Tafalla-002

Pamplona,18, Tafalla (31300), Navarra, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity6 bays (6 plugs)
GPS Coordinates42.53660, -1.66938
Official IDJ5QGKE4PAEERHWJQWLPJ

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Tafalla, belonging to the province of Navarra (Navarra, Comunidad Foral de, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)22 kW
Current type:Alternating Current (AC)
Format:Socket
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)22 kW
Current type:Alternating Current (AC)
Format:Socket
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)22 kW
Current type:Alternating Current (AC)
Format:Socket
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)22 kW
Current type:Alternating Current (AC)
Format:Socket
Voltage:400 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)22 kW
Current type:Alternating Current (AC)
Format:Socket
Voltage:400 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)22 kW
Current type:Alternating Current (AC)
Format:Socket
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeJ5QGKE4PAEERHWJQWLPJ
Post / EVSE Identifier #1RNVYDVSARVX1ZAHQ8DAKMHEFNPY
Post / EVSE Identifier #2ES*IBD*E263695
Post / EVSE Identifier #3276885
Post / EVSE Identifier #4QKMVQSPPWN6DPZMIUILARGKHRY5
Post / EVSE Identifier #5ES*IBD*E263696
Post / EVSE Identifier #6276886
Post / EVSE Identifier #7BSZC5U4BKKNWR08IATKIA2DIHIM
Post / EVSE Identifier #8ES*IBD*E263697
Post / EVSE Identifier #9276887
Post / EVSE Identifier #10G5QZUFBHHFEXBUZOKQEBIT2TSJL
Post / EVSE Identifier #11ES*IBD*E263698
Post / EVSE Identifier #12276888
Post / EVSE Identifier #13PAYBPYAPOBHIJZ5VSO5MFDPFMFG
Post / EVSE Identifier #14ES*IBD*E263699
Post / EVSE Identifier #15276889
Post / EVSE Identifier #16ED4EQF4MZ9PFLEQQSWS280UPS9P
Post / EVSE Identifier #17ES*IBD*E263700
Post / EVSE Identifier #18276890

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Miercoles (09:00 - 21:30) Lunes (09:00 - 21:30) Viernes (09:00 - 21:30) Jueves (09:00 - 21:30) Martes (09:00 - 21:30)

Supported Payment Methods

APAGADO/ENCENDIDO REMOTO ADMITIDO, LECTOR RFID

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.536596 | Lon: -1.669384View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)
2.5 km away

NA-Tafalla-001

Crta Zaragoza Km,33
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2
3 points • 3 plugs
Details
50 kW(Fast)
4.1 km away

19XM32T8KK3AR00056

Ctra. Zaragoza, Km 38, 31300 Tafalla,
Operator:ENDESA X WAY, S.L.
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
3 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 10/09/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.