22 kW• Semi-fast24/7Active in MITECO registry

AhorraMas Av. del Juncal

Av. Del Juncal 1, San Sebastián de los Reyes (28703), Madrid, Spain
Network OperatorEDP CLIENTES SAU
Total Capacity5 bays (5 plugs)
GPS Coordinates40.54066, -3.62534
Official ID2023002361

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of San Sebastián de los Reyes, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the EDP CLIENTES SAU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)22 kW
Current type:Alternating Current (AC)
Format:Socket
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)22 kW
Current type:Alternating Current (AC)
Format:Socket
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)22 kW
Current type:Alternating Current (AC)
Format:Socket
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)7.36 kW
Current type:Alternating Current (AC)
Format:Socket
Voltage:230 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)7.36 kW
Current type:Alternating Current (AC)
Format:Socket
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023002361
Post / EVSE Identifier #1COD20230000011784PR00000800
Post / EVSE Identifier #2ES*EDP*E00624
Post / EVSE Identifier #31
Post / EVSE Identifier #4COD20230000011785PR00000801
Post / EVSE Identifier #5ES*EDP*E00625
Post / EVSE Identifier #6COD20230000011786PR00000802
Post / EVSE Identifier #7ES*EDP*E00626
Post / EVSE Identifier #8COD20230000011787PR00000803
Post / EVSE Identifier #9ES*EDP*E00627
Post / EVSE Identifier #10COD20230000011788PR00000804
Post / EVSE Identifier #11ES*EDP*E00674

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

APAGADO/ENCENDIDO REMOTO ADMITIDO

Accessibility & Amenities

Accessibility: SI. Additional amenities: SUPERMERCADO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.54066 | Lon: -3.625342View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
2.7 km away

M-ALCOBENDAS-008

Marquesa Viuda Aldama,50
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 10/09/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.