50 kW• Fast24/7Active in MITECO registry

61946052780019

Agricola Montsant Prades - Carrer Priorat, 12, Capafonts (43364), Tarragona, Spain
Network OperatorENDESA X WAY, S.L.
Total Capacity3 bays (3 plugs)
GPS Coordinates41.31246, 0.98692
Official ID2023003256

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Capafonts, belonging to the province of Tarragona (Cataluña, Spain). The charging equipment and commercial operation belong to the ENDESA X WAY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CHAdeMO50 kW
Current type:Direct Current (DC)
Format:Cable
2Charging Bay #2
1 connector available
CCS Combo 250 kW
Current type:Direct Current (DC)
Format:Cable
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)21.06 kW
Current type:Alternating Current (AC)
Format:Socket

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023003256
Post / EVSE Identifier #1COD20230000012339PR00002613
Post / EVSE Identifier #2ES*ESX*E619460527800192
Post / EVSE Identifier #32
Post / EVSE Identifier #4COD20230000012340PR00002614
Post / EVSE Identifier #5ES*ESX*E619460527800191
Post / EVSE Identifier #61
Post / EVSE Identifier #7COD20230000012341PR00002615
Post / EVSE Identifier #8ES*ESX*E619460527800193
Post / EVSE Identifier #93

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Jueves (00:00 - 23:59) Martes (00:00 - 23:59) Lunes (00:00 - 23:59) Miercoles (00:00 - 23:59) Domingo (00:00 - 23:59) Viernes (00:00 - 23:59) Sabado (00:00 - 23:59)

Supported Payment Methods

APAGADO/ENCENDIDO REMOTO ADMITIDO, CAPACIDAD DE DESBLOQUEO, RESERVABLE, LECTOR RFID

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.31246 | Lon: 0.98692View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
13.0 km away

22XP22T3KK4AK00049

Avinguda De Catalunya, 25, 25450 L'albi,
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
120 kW(Fast)
13.0 km away

L-Vinaixa-001

Escoles Obras Pcl,N/A
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2Tipo 2 (Mennekes)
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 10/09/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.