50 kW• Fast24/7Active in MITECO registry

61945052640006

Ctra. Íscar-Cuéllar, 115, 47420 Íscar,, Íscar (47420), Valladolid, Spain
Network OperatorENDESA X WAY, S.L.
Total Capacity3 bays (3 plugs)
GPS Coordinates41.36833, -4.50663
Official ID2023003815

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Íscar, belonging to the province of Valladolid (Castilla y León, Spain). The charging equipment and commercial operation belong to the ENDESA X WAY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 250 kW
Current type:Direct Current (DC)
Format:Cable
2Charging Bay #2
1 connector available
CHAdeMO50 kW
Current type:Direct Current (DC)
Format:Cable
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)21.06 kW
Current type:Alternating Current (AC)
Format:Socket

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023003815
Post / EVSE Identifier #1COD20230000013486PR00003760
Post / EVSE Identifier #2ES*ESX*E619450526400061
Post / EVSE Identifier #31
Post / EVSE Identifier #4COD20230000013487PR00003761
Post / EVSE Identifier #5ES*ESX*E619450526400062
Post / EVSE Identifier #62
Post / EVSE Identifier #7COD20230000013488PR00003762
Post / EVSE Identifier #8ES*ESX*E619450526400063
Post / EVSE Identifier #93

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Martes (00:00 - 23:59) Miercoles (00:00 - 23:59) Viernes (00:00 - 23:59) Domingo (00:00 - 23:59) Sabado (00:00 - 23:59) Lunes (00:00 - 23:59) Jueves (00:00 - 23:59)

Supported Payment Methods

RESERVABLE, LECTOR RFID, CAPACIDAD DE DESBLOQUEO, APAGADO/ENCENDIDO REMOTO ADMITIDO

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.368329 | Lon: -4.506628View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)⛽Estación Repsol
3.0 km away

Repsol ES, CRED Iscar

Cr C-112, 21
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
1 point • 3 plugs
Details
150 kW(Ultra-fast)
3.7 km away

SN2206300700

Av. San Miguel, 47, 47420 Íscar, Valladolid,
Operator:ENDESA X WAY, S.L.
CCS Combo 2
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 10/09/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.