50 kW• Fast24/7Active in MITECO registry

61943050290004

E.S. Bardenas - Pol. Indust. La Serna, C/ B, Tudela (31500), Navarra, Spain
Network OperatorENDESA X WAY, S.L.
Total Capacity3 bays (3 plugs)
GPS Coordinates42.07615, -1.64257
Official ID2023003797

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Tudela, belonging to the province of Navarra (Navarra, Comunidad Foral de, Spain). The charging equipment and commercial operation belong to the ENDESA X WAY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 250 kW
Current type:Direct Current (DC)
Format:Cable
2Charging Bay #2
1 connector available
CHAdeMO50 kW
Current type:Direct Current (DC)
Format:Cable
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)21.06 kW
Current type:Alternating Current (AC)
Format:Socket

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023003797
Post / EVSE Identifier #1COD20230000013442PR00003716
Post / EVSE Identifier #2ES*ESX*E619430502900041
Post / EVSE Identifier #31
Post / EVSE Identifier #4COD20230000013443PR00003717
Post / EVSE Identifier #5ES*ESX*E619430502900042
Post / EVSE Identifier #62
Post / EVSE Identifier #7COD20230000013444PR00003718
Post / EVSE Identifier #8ES*ESX*E619430502900043
Post / EVSE Identifier #93

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Lunes (00:00 - 23:59) Miercoles (00:00 - 23:59) Jueves (00:00 - 23:59) Martes (00:00 - 23:59) Domingo (00:00 - 23:59) Sabado (00:00 - 23:59) Viernes (00:00 - 23:59)

Supported Payment Methods

APAGADO/ENCENDIDO REMOTO ADMITIDO, CAPACIDAD DE DESBLOQUEO, LECTOR RFID, RESERVABLE

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.076146 | Lon: -1.642569View on OpenStreetMap →

Other Nearby Charging Stations

60 kW(Fast)
2.4 km away

US_231_Tudela

Avda. Ricardo Mella 137
Operator:PLENOIL, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
50 kW(Fast)
2.4 km away

NA-Tudela-001

Corella,10
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
2 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 10/09/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.