50 kW• Fast24/7Active in MITECO registry

61942049840011

Av. Alcalde Gómez Laguna, 151, 50012, Zaragoza (50012), Zaragoza, Spain
Network OperatorENDESA X WAY, S.L.
Total Capacity3 bays (3 plugs)
GPS Coordinates41.63322, -0.92358
Official ID2024005039

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Zaragoza, belonging to the province of Zaragoza (Aragón, Spain). The charging equipment and commercial operation belong to the ENDESA X WAY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 250 kW
Current type:Direct Current (DC)
Format:Cable
2Charging Bay #2
1 connector available
CHAdeMO50 kW
Current type:Direct Current (DC)
Format:Cable
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)43 kW
Current type:Alternating Current (AC)
Format:Socket

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024005039
Post / EVSE Identifier #1COD20240000040959PR00013132
Post / EVSE Identifier #2ES*ESX*E619420498400111
Post / EVSE Identifier #31
Post / EVSE Identifier #4COD20240000040960PR00013133
Post / EVSE Identifier #5ES*ESX*E619420498400112
Post / EVSE Identifier #62
Post / EVSE Identifier #7COD20240000040961PR00013134
Post / EVSE Identifier #8ES*ESX*E619420498400113
Post / EVSE Identifier #93

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Jueves (00:00 - 00:00) Miercoles (00:00 - 00:00) Martes (00:00 - 00:00) Lunes (00:00 - 00:00) Domingo (00:00 - 00:00) Sabado (00:00 - 00:00) Viernes (00:00 - 00:00)

Supported Payment Methods

RESERVABLE, LECTOR RFID, CAPACIDAD DE DESBLOQUEO, APAGADO/ENCENDIDO REMOTO ADMITIDO

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.633222 | Lon: -0.923577View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
1.9 km away

Z-Zaragoza-020

Eduardo Ibarra,S/N
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
50 kW(Fast)
3.1 km away

E.S. PORTAZGO

AUTOVÍA DE LOGROÑO KM. 0,3
Operator:ZOILO RIOS, S.A.
CCS Combo 1Tipo 2 (Mennekes)CHAdeMO
1 point • 3 plugs
Details
50 kW(Fast)
3.1 km away

E.S. LOS IBONES

Pº LAGOS DEL ALBA Nº2 (N-232 P.K 243 margen dcho)
Operator:ZOILO RIOS, S.A.
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
1 point • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 10/09/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.