11 kW• Semi-fast24/7Active in MITECO registry

22XP22T3KKJAK00146

C/ Garbera Zh, 5 1, Bajo, 1 Donostia-San, Donostia/San Sebastián (20017), Gipuzkoa, Spain
Network OperatorENDESA X WAY, S.L.
Total Capacity2 bays (2 plugs)
GPS Coordinates43.31012, -1.94295
Official ID2024006003

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Donostia/San Sebastián, belonging to the province of Gipuzkoa (País Vasco, Spain). The charging equipment and commercial operation belong to the ENDESA X WAY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)11 kW
Current type:Alternating Current (AC)
Format:Socket
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)11 kW
Current type:Alternating Current (AC)
Format:Socket

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024006003
Post / EVSE Identifier #1COD20240000043019PR00015164
Post / EVSE Identifier #2ES*ESX*E22XP22T3KKJAK001461
Post / EVSE Identifier #31
Post / EVSE Identifier #4COD20240000043020PR00015165
Post / EVSE Identifier #5ES*ESX*E22XP22T3KKJAK001462
Post / EVSE Identifier #62

Theoretical Charging Times at Maximum Power (11 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~1 h 49 min(~1.8 hours)
40 kWh Battery~3 h 38 min(~3.6 hours)
60 kWh Battery~5 h 27 min(~5.5 hours)
80 kWh Battery~7 h 16 min(~7.3 hours)

Opening Hours

Martes (00:00 - 00:00) Miercoles (00:00 - 00:00) Viernes (00:00 - 00:00) Domingo (00:00 - 00:00) Sabado (00:00 - 00:00) Lunes (00:00 - 00:00) Jueves (00:00 - 00:00)

Supported Payment Methods

RESERVABLE, APAGADO/ENCENDIDO REMOTO ADMITIDO, CAPACIDAD DE DESBLOQUEO, LECTOR RFID

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.310125 | Lon: -1.942955View on OpenStreetMap →

Other Nearby Charging Stations

150 kW(Ultra-fast)
2.2 km away

Petritegi Sagardotegia

Petritegi Bidea, 8
Operator:WENEA EMOBILITY SERVICES S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
4 points • 4 plugs
Details
50 kW(Fast)
2.4 km away

SS-SanSebastian-001

Begiristain Dok. Ps,75
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
2 points • 3 plugs
Details
7.4 kW(Semi-fast)
3.0 km away

APK2 Plaza Pío XII

Plaza Pío Xii S/N
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 10/09/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.